New route open to alleviate
congestion at Ho Chi Minh City airport
People travel on Bach
Dang Street on the morning of August 30, 2016.
A new route has been put into
operation in the hope of relieving traffic overloads commonly seen at the
entrance of the international airport in Ho Chi Minh City.
The
municipal Department of Transport on Tuesday officially opened the Tan Son
Nhat – Binh Loi – Vanh Dai Ngoai (Outer Belt) route connecting Tan Son Nhat
International Airport in Tan Binh District with Go Vap, Binh Thanh, and Thu
Duc districts in the southern hub.
Speaking
at the inauguration ceremony, Vu Dinh Tan, a representative of South Korea’s
GS Engineering & Construction Corporation, said the project was based on
a build-transfer (BT) contract and had been completed after ten years.
According
to Bui Xuan Cuong, director of the Department of Transport, the route
includes the newly constructed Pham Van Dong Street and the expanded sections
of Bach Dang and Hong Ha roads.
The
new streets will link the aerodrome with several districts in Ho Chi Minh
City as well as connect the southern metropolis with its neighboring Binh
Duong, Binh Phuoc, and Dong Nai provinces, Cuong continued.
The
project is expected to alleviate traffic congestion at the entrance to the
airport and on nearby roads, the official added.
Nguyen
Van Vu, a resident on Bach Dang Street, expressed his support for the new
route, stating that it would provide local citizens with more favorable
conditions to travel to and conduct business operations in other parts of the
city.
However,
many commuters have reported that gridlocks were still present at several
traffic hotspots near the airport during rush hours.
Some
people have been travelling in the wrong lanes as they were unfamiliar with
the new street, which has also been exacerbating congestion.
To
further relieve traffic pressure in the area, the municipal People’s
Committee has funded more projects in a bid to permanently eliminate the
problem, said Director Cuong.
The
Tan Son Nhat – Binh Loi – Vanh Dai Ngoai route is 13.6 kilometers long, beginning
at the entrance of Tan Son Nhat airport and ending at the intersection of
Linh Xuan Street and National Highway 1 in Thu Duc District.
It
comprises of the three-lane Bach Dang and Hong Ha Street and the 12-lane Pham
Van Dong Street.
The
total cost of the project includes US$186 million worth of construction,
channeled by investors, and VND6.7 trillion ($300 million) for land
clearance, funded by the city budget.
TUOI TRE NEWS
|
Thứ Năm, 1 tháng 9, 2016
Đăng ký:
Đăng Nhận xét (Atom)
Không có nhận xét nào:
Đăng nhận xét