|
Internet connectivity
100% restored in
An Internet cable
is seen at a server room in this photo illustration. Reuters
Internet users in
Repairs to the ruptures on the section S1I, connecting
the Vietnamese coastal city of Vung Tau and Hong Kong, of the AAG (Asia
Gateway Pacific) underwater cable system started at 11:15 pm on Wednesday and
finished around 7:45 am today, October 2, the AAG operator said.
By that time, 100 percent of
The repair task will officially finish at 7:00 am on
October 4, with cable burying work now in progress.
It was expected that Internet connection in
The first break
on the S1I section was identified at 11:41 pm on September 15, at a location
64km from
The cable breaks then slowed down Internet traffic in
the country.
Internet traffic in
The AAG is a 20,000-kilometer-long submarine
communications cable system, connecting Southeast Asia with the
The cable has encountered frequent breaks and outages
since it was completed in late 2009.
Tuoi Tre news
|
Thứ Năm, 2 tháng 10, 2014
Đăng ký:
Đăng Nhận xét (Atom)


Không có nhận xét nào:
Đăng nhận xét